ussr
VIII
heavyTank
Kirovets-1
role_HT_break

Breakthrough Heavy Tank

Gold cost
8,600 (~€31.10)Gold

Historical Reference

The Kirovets-1 project (IS-3, prototype No. 1) was developed from July through November 1944. The prototype was built at the Chelyabinsk Kirov Plant in September–October 1944. From December 18 through December 24, 1944, the vehicle underwent trials at the NIBT proving grounds in Kubinka. After it was decided to manufacture a pilot series of the modified IS-2 with a hull proposed by engineers of Plant No. 100 and Central Research Institute-48, the work on the Kirovets-1 was discontinued.

Loading marks data...

Loading mastery data...

commander
driver
gunner
loader
+
+
+
+
+
+
+